FCC Formally Publishes Final Federal Register Rule Modifying 24 GHz Band Emission Limits

The Federal Communications Commission (FCC) formally published its final regulatory action in the Federal Register (89 FR 100856, FR Doc. 2024-29313) regarding ET Docket No. 21-186, titled "Modifying Emissions Limits for the 24.25–24.45 GHz and 24.75–25.25 GHz Bands." This publication updates Part 2 and Part 30 of the Code of Federal Regulations (CFR), establishing a legally binding effective date of January 13, 2025, for the modified out-of-band emission (OOBE) limits. The finalized rules codify technical parameters agreed upon at the ITU World Radiocommunication Conference in 2019 (WRC-19) under Resolution 750, ensuring primary passive sensor services operating in the adjacent 23.6–24.0 GHz band—such as atmospheric measurements gathered by NOAA and NASA for the Earth Exploration-Satellite Service (EESS)—remain protected from unwanted mobile broadband emissions.

The Federal Register notice details the specific technical milestones and total radiated power (TRP) restrictions imposed on Upper Microwave Flexible Use Service (UMFUS) operations in the 24 GHz band. For mobile and base stations brought into use prior to September 1, 2027, the maximum conducted output power or TRP of emissions within any 200 MHz of the 23.6–24.0 GHz band must not exceed −29 dBW for mobile stations and −33 dBW for base stations. Equipment brought into use after September 1, 2027—or legacy equipment that undergoes modifications altering its emission characteristics—must adhere to stricter long-term limits of −35 dBW/200 MHz for mobile units and −39 dBW/200 MHz for base stations. Additionally, the publication updates key regulatory definitions, including maximum conducted output power measurements, to establish clear evaluation criteria during compliance testing.

Following the formal Federal Register publication and the January 13, 2025 effective date, the updated Part 30 technical criteria govern all FCC equipment authorizations for 24 GHz millimeter-wave transmitters. Telecommunications Certification Bodies (TCBs) and accredited test laboratories now require compliance reports to explicitly demonstrate adherence to the Resolution 750 TRP thresholds. Manufacturers and wireless carriers deploying 5G hardware must verify that current and future equipment designs satisfy both the interim and post-2027 emission profiles to maintain market access and legal operation within the United States.

Thinking about compliance testing and certification?

Contact us today for a free consultation or more information.

Get In Touch