The Federal Communications Commission (FCC) Laboratory Division has updated KDB 842590 D01 (v01r03), establishing mandatory technical certification standards and measurement procedures for millimeter-wave (mmWave) devices operating under Part 30 Upper Microwave Flexible Use Service (UMFUS) rules. Following Report and Order FCC 24-124, the FCC introduced significantly stricter Out-of-Band Emission (OOBE) restrictions—commonly referred to as Resolution 750 limits—specifically to protect passive satellite services operating in the adjacent 23.6–24.0 GHz band. Under these rules, mobile stations and base stations operating within the 24 GHz spectrum (24.25–24.45 GHz and 24.75–25.25 GHz) face phased reduction targets. Phase 1 requirements, effective since January 13, 2025, cap maximum allowable emissions at -33 dBW/200 MHz for base stations and -29 dBW/200 MHz for mobile stations. Phase 2 rules will impose even tighter limits starting September 1, 2027, reducing allowable emissions to -39 dBW/200 MHz for base stations and -35 dBW/200 MHz for mobile devices.
These Resolution 750 OOBE restrictions strictly target mobile operations and base stations, whereas transportable stations, fixed point-to-point, and point-to-multipoint links remain exempt, continuing to operate under fixed service standards. Furthermore, equipment authorization rules mandate that equipment certified prior to September 1, 2027, must meet Phase 1 or Phase 2 limits, but any unit brought into active deployment on or after September 1, 2027, must strictly meet Phase 2 limits regardless of its initial certification date. Existing deployed base stations operating under Phase 1 limits can remain in service, provided modifications do not trigger formal Class II or Class III permissive change filings. However, any permissive changes processed after the September 2027 deadline will require full compliance with the stricter Phase 2 threshold. Equipment manufacturers and test laboratories must also demonstrate far-field radiated compliance over full frequency ranges, include accredited laboratory scope documentation up to the highest investigated harmonic, and utilize validated Total Radiated Power (TRP) or conducted measurement methods such as rolling integration to confirm compliance across complex mmWave beam-forming configurations.
Contact us today for a free consultation or more information.
Get In TouchVista Compliance Laboratories and Vista Laboratories, Inc. © Copyright 2022. All rights reserved.