The Federal Communications Commission (FCC) published its final rule under WT Docket No. 24-243 and GN Docket No. 14-177 (FCC 25-24, FR Doc. 2025-10476) in the Federal Register, formalizing the regulatory framework for the Lower 37 GHz band (37.0–37.6 GHz). Taking effect on July 14, 2025, the rules establish a co-primary, non-exclusive spectrum sharing model across 600 megahertz of millimeter-wave spectrum. This mechanism allows commercial operators, private industrial enterprises, local entities, and federal agencies to access high-capacity millimeter-wave spectrum without relying on exclusive geographic auctions. Part of broader initiatives under the National Spectrum Strategy, the decision opens crucial millimeter-wave capacity for private 5G, industrial automation, fixed point-to-point backhaul, and high-density enterprise networks.
The finalized regulatory framework establishes a two-phase coordination process governing non-federal access to the band. Licensees must first obtain a nationwide, non-exclusive license before registering individual site locations, base station parameters, and coverage contours in a centralized coordination database to secure provisional, first-in-time interference protection against subsequent registrants. While non-federal and federal users share equal co-primary rights across the upper 400 megahertz (37.2–37.6 GHz), the lower 200 megahertz (37.0–37.2 GHz) grants priority operational rights to Department of Defense (DoD) military installations. In co-channel fixed-satellite service (FSS) earth station protection zones (37.5–37.6 GHz), non-federal registrants must also secure formal consent from earth station operators prior to registering new site locations.
To safeguard adjacent operations, the framework incorporates technical compliance mandates under Part 30 rules to protect passive Earth Exploration-Satellite Service (EESS) and Space Research Service (SRS) operations in the neighboring 36.0–37.0 GHz band. Equipment vendors, test laboratories, and telecommunications compliance engineers evaluating Lower 37 GHz hardware—including 5G NR base stations, active beamforming antenna arrays, and high-density fixed links—must ensure strict adherence to total radiated power limits, site-coordination contour parameters, and out-of-band emission (OOBE) suppression standards. While core rules went into effect in mid-2025, specific site registration provisions (§§ 30.501 and 30.503) were delayed pending final administrative approvals, as the FCC continues refining dynamic spectrum management tools for full operational deployment.
Contact us today for a free consultation or more information.
Get In TouchVista Compliance Laboratories and Vista Laboratories, Inc. © Copyright 2022. All rights reserved.