FCC Considers Hitachi Rail Waiver Request for Unlicensed Radio Transmitters in Restricted 3.8-4.5 MHz Spectrum

The Federal Communications Commission’s Office of Engineering and Technology (OET) issued Public Notice DA 25-630 under ET Docket No. 25-225, seeking public comment on a waiver request submitted by Hitachi Rail STS USA. Hitachi requested regulatory relief from Section 15.205(a) of the Commission’s rules, which restricts intentional radiators from operating within designated restricted frequency bands. Specifically, the waiver seeks authorization to manufacture, test, and deploy specialized unlicensed radio transmitting equipment operating in the 3.8–4.5 MHz frequency band for automatic train control and railway safety signaling networks across North America.

The regulatory challenge stems from the fact that Section 15.205(a) explicitly safeguards the 3.8–4.5 MHz band to prevent harmful interference to critical primary communication services, including aviation, maritime, and public safety radio infrastructure. To address safety concerns, Hitachi’s technical petition detailed low-power, localized magnetic field loop technology designed to constrain electromagnetic emissions strictly within track bed boundaries, preventing signal leakage into adjacent spectrum allocations. Following the public notice and review of stakeholder filings, the FCC evaluated the potential for harmful interference against the operational benefits of modernized railway safety, ultimately granting the waiver under Order DA 26-350 with strict technical conditions, maximum magnetic field strength limits, and mandatory operational coordination with nearby incumbent licensees.

For railway technology developers, industrial IoT manufacturers, and EMC compliance engineers, the FCC’s action underscores the procedural path for deploying specialized industrial equipment in restricted spectrum bands. Entities seeking to commercialize non-standard wireless devices in restricted frequency ranges must submit comprehensive electromagnetic field studies and technical mitigation strategies to demonstrate that operations will not cause harmful interference. Equipment manufacturers operating under individual FCC waivers must ensure that final product documentation, Telecommunications Certification Body (TCB) filings, and equipment labels explicitly reference waiver conditions to maintain full regulatory compliance for U.S. market deployment.

Thinking about compliance testing and certification?

Contact us today for a free consultation or more information.

Get In Touch